EPDM Wall Flashing Repair — Oldcastle Infrastructure, Littleton

Project Overview

Roof Condition

Oldcastle Infrastructure’s precast concrete manufacturing plant in Littleton had a stone-ballasted EPDM roof with failed wall flashings on two sides of the building. On the north parapet, the EPDM flashing had torn loose and was hanging off the wall, leaving the wood behind it exposed to weather. Along the east side, where the flat roof meets a metal roof, the flashing had also failed.

Evaluation & Approach

The EPDM field membrane under the stone ballast was still serviceable. The failures were at the walls where the flashing had pulled loose, not in the field. Targeting the walls fixed where the roof was actually leaking without disturbing the working field membrane.

Why This Approach

Scope of Work

  1. North Parapet — Substrate Replacement: Removed the failed EPDM and the old ¼” wall sheathing on about 60 linear feet of the north parapet. Installed new ½” wall substrate.
  2. North Parapet — Field Sheet Securement: Fastened the existing EPDM field membrane at the base of the wall with 2 3/8” membrane plates 9” on center to prevent the membrane from pulling on the new flashing.
  3. North Parapet — New Flashing: Fully adhered new 60-mil EPDM flashing up the north parapet wall over the new substrate.
  4. East Transition — Field Sheet Securement: Fastened the existing EPDM field sheet at the vertical wall with membrane plates 9” on center along about 100 linear feet of the east side.
  5. East Transition — New Flashing: Fully adhered new 60-mil EPDM flashing up the wall and 12” under the metal roofing, then refastened the metal panels.
  6. Additional Repairs and Ballast: Completed two additional repair areas identified on the project walk, then replaced the stone ballast in all work areas.

Result

Warranty: 5-year warranty on repaired areas